Shaanxi Changqing Energy & Chemical 600 KTA Coal to Methanol Project

Delivery Time
2013
Service Mode
EM+PC
Project Owner
Shaanxi Changqing Energy & Chemical Co., Ltd.
Contract Mode: EM+PC

Time: 2011 – 2013

Project Description:

• 75,000 Nm³/h air separation unit

• 180,000 Nm³/h syngas gasification unit (GE slurry coal gasification technology, gasifiers 2+1 × 1,500 t/d)

• 180,000 Nm³/h syngas shift and heat recovery unit

• 180,000 Nm³/h low-temperature methanol wash unit (Linde technology)

• 600,000 t/a methanol synthesis unit (Casale technology)

• 7,000 t/a sulfur recovery unit (Hofmann technology, Netherlands)

• Utilities and auxiliary facilities