Time: 2011 – 2013
Project Description:
• 75,000 Nm³/h air separation unit
• 180,000 Nm³/h syngas gasification unit (GE slurry coal gasification technology, gasifiers 2+1 × 1,500 t/d)
• 180,000 Nm³/h syngas shift and heat recovery unit
• 180,000 Nm³/h low-temperature methanol wash unit (Linde technology)
• 600,000 t/a methanol synthesis unit (Casale technology)
• 7,000 t/a sulfur recovery unit (Hofmann technology, Netherlands)
• Utilities and auxiliary facilities
Message Inquiry