Erdos Guotai Chemical 400 KTA Coal to Methanol Project

Delivery Time
2014
Service Mode
EPC
Project Owner
Erdos Guotai Chemical Ltd.
Contract Mode: EPC

Time: 2012 – 2014

Project Description:

• 50,000 Nm³/h air separation unit (Hangyang technology)

• 120,000 Nm³/h syngas gasification unit (Huali slurry coal gasification technology, gasifiers 1+1 × 2,000 t/d)

• 120,000 Nm³/h syngas shift and heat recovery unit

• 120,000 Nm³/h low-temperature methanol wash unit

• Utilities and auxiliary facilities