Time: 2007 – 2012
Project Description (Phase I – 300 kt/a):
• 40,000 Nm³/h air separation unit
• 100,000 Nm³/h syngas gasification unit
• 100,000 Nm³/h syngas shift and heat recovery unit (Wison technology)
• 45,000 Nm³/h low-temperature methanol wash unit
• 300 kt/a methanol synthesis unit
• 7,860 t/a sulfur recovery unit
• Utilities and auxiliary facilities
Message Inquiry