Erdos Jinchengtai Chemical 600 KTA Coal to Methanol Project

Delivery Time
2011
Service Mode
EPCM
Project Owner
Erdos Jinchengtai Chemical Ltd.
Contract Mode: EPCM

Time: 2007 – 2012

Project Description (Phase I – 300 kt/a):

• 40,000 Nm³/h air separation unit

• 100,000 Nm³/h syngas gasification unit

• 100,000 Nm³/h syngas shift and heat recovery unit (Wison technology)

• 45,000 Nm³/h low-temperature methanol wash unit

• 300 kt/a methanol synthesis unit

• 7,860 t/a sulfur recovery unit

• Utilities and auxiliary facilities