Home Solutions Project Case

Fujian SCC 400 KTA Polyamide Project

Delivery Time
2022
Service Mode
EPC
Project Owner
Fujian SCC
Contract Mode: EPC

Time: 2019 – 2022

Project Description:

• 55,000 Nm³/h oxygen ASU

• 154,000 Nm³/h syngas shift and heat recovery unit

• 154,000 Nm³/h syngas low-temperature methanol wash unit

• 100,000 Nm³/h hydrogen PSA unit (maximum capacity)

• 450 kt/a liquid ammonia nitrogen wash unit (maximum capacity)

• 450 kt/a liquid ammonia synthesis and refrigeration unit (maximum capacity)

• 19.8 kt/a sulfur recovery unit

• Utilities and auxiliary facilities

• Global largest caprolactam production base with integrated upstream and downstream expansion

• Coal-to-hydrogen ammonia unit: 300,000 t/y ammonia, 75,000 Nm³/h hydrogen



Message Inquiry

Click 'Submit' to indicate that you agree to the Privacy Policy.
© 2025 Copyright Wison Engineering Ltd.
© 2025 Copyright Wison Engineering Ltd.

Legal Statement | Privacy Policy | Website Support