Air Products and Chemicals 1,200 KTA Ammonia Synthesis Project

Time
2020 – 2021
Contract Mode
EPF
Client
Air Products and Chemicals, INC.

Project Description:

• Ammonia synthesis unit (TOPSOE technology)

• Cooling water system

• Compressors and utilities

• Seamless EPF integration to minimize client interface management

• Maximized modular detailed design to reduce on-site construction costs and accelerate schedule


The project is located in Texas, USA, and was Wison Engineering’s first fully modularized EPC project. Acting as general contractor, Wison delivered end-to-end services from FEED and detailed design to procurement and modular execution. The plant was divided intoze modular units and stick-built areas, with extensive indoor prefabrication enhancing schedule control and quality. To ensure precision, Wison enforced stringent fabrication and installation procedures and provided comprehensive technical support for module transportation and lifting, demonstrating strong EPC capabilities.









Leave us a message

By submitting this message, you confirm that you have read and agree to our privacy policy.
© 2025 Copyright Wison Engineering Ltd.
© 2025 Copyright Wison Engineering Ltd.

Legal Statement | Privacy Policy | Website Support