Contract Mode: E
Time: 2013
Project Description:
• 45,000 Nm³/h air separation unit
• 95,000 Nm³/h syngas gasification unit (1,500 t/d gasifier)
• 95,000 Nm³/h syngas shift and heat recovery unit (Wison proprietary technology)
• 95,000 Nm³/h low-temperature methanol wash unit
• 300 kt/a ammonia synthesis and refrigeration unit
• 6,000 t/a sulfur recovery unit
• Utilities and auxiliary facilities
• National Quality Project Award 2018–2019
• Third Prize for Excellent Design Achievement 2017
• First Prize for Provincial Outstanding Survey & Design Innovation 2018
Message Inquiry