Contract Mode: E+PMC; Furnace Area: EPF
Time: 2017 – 2020
Project Description:
• 1,000 KTA Ethylene Unit (S&W Technology)
• Including a 60 KTA Pyrolysis Gasoline Hydrogenation Unit
• China’s first ethylene unit designed and delivered with full digital integration
• Covers an area of 10.5 hectares, saving over 10% of land compared with units of similar scale
• Achieved steel savings of approximately 2,200 tons in cracking furnaces and pipe rack structures