Wanhua 1200 KTA Ethylene Project (Phase II)

Delivery Time
2025
Service Mode
Technology Licensing + EPC
Project Owner
Wanhua Chemical Group Co., Ltd
Contract Mode: EPC
Time: 2025
Project Description:
• 1.2 MMTA Ethylene Unit (Wison Technology)
• The first large-scale commercial application of Wison’s million-ton complete-set ethylene technology
• Gas and liquid furnaces adopt Wison HS-I and HS-II cracking furnace technologies, respectively
• Higher thermal efficiency: 95+%
• Lower NOₓ emissions: 40 mg/Nm³
• Capacities: 250 KTA (HS-I), 200 KTA (HS-II)
• Extended run lengths: >90 days (HS-I), >60 days (HS-II)

This 1.2 MTPA ethylene plant adopts Wison Engineering’s patented HS-I and HS-II cracking furnaces, together with advanced separation technologies including pre-cut, methane wash, and ethylene heat pump systems. The design accommodates multiple feedstocks such as ethane, butane, and naphtha, maximizing ethylene recovery, reducing energy consumption, and extending operating cycles. A C2 recycling process is applied to minimize start-up material emissions, and the project is executed with a deeply integrated digital design. Wison’s scope of work includes process package design, basic and detailed engineering, procurement support, and turnkey PC services for the cracking furnaces.






Message Inquiry

Click 'Submit' to indicate that you agree to the Privacy Policy.
© 2025 Copyright Wison Engineering Ltd.
© 2025 Copyright Wison Engineering Ltd.

Legal Statement | Privacy Policy | Website Support