Contract Mode: EM+PC
Time: 2009 – 2013
Project Description:
• 650 KTA Paraxylene (PX) and Aromatics Complex
• 650 KTA Paraxylene (PX) Unit
• 2,000 KTA Continuous Reforming Unit (including PSA)
• 2,700 KTA Wax Oil Hydrocracking Unit
• 100 KTA Sulfur Recovery Complex
• 800 KTA Ethylene Unit – Cracking Furnaces and Front Pipe Rack (S&W Technology)
• 300 KTA Linear Low-Density Polyethylene (LLDPE) Unit
• Utilities and Auxiliary Facilities for the Chemical Area of the Refining and Petrochemical Integration Project
• Upon delivery, it was the largest single-built refining and ethylene integrated project in China