Contract Mode: PMC
Time: 2006 – 2008
Project Description:
• 6.0 MMTA Diesel Hydrotreating Unit
• 2.2 MMTA Continuous Reforming Unit
• 3.6 MMTA Hydrocracking Unit
• 20×10⁴ Nm³/h Hydrogen Production Unit
• 3.0 MMTA Residue Hydrodesulfurization Unit
• 270 KTA Sulfur Recovery Unit
• China’s first 20 MMTA large-scale refinery turnkey project
• Undertook 7 units, with 6 of them being world-class large-scale units at the time
• Accelerated the project construction schedule by 6 months