Contract Mode: EPC
Time: 2018 – 2021
Project Description:
• Boiler: 270 t/h high-pressure steam, 73 barg, 460°C
• BFW Pump: 300 m³/h, liquid differential head 1,081 m
• Wison Engineering’s first project in the UAE
• Intermediate project handover completed one month ahead of schedule